Port Authority Essential Jacket
Port Authority Essential Jacket
Decoration Methods
Decoration Methods
DTG / DTF Printing:
DTF Printing can be done to the front, back, or side of the garment, front and back is limited to an area of 10" x 12" and side is limited according to the specific garment type. Cost of DTF printing is included in the price.
Embroidery:
Embroidery can be done to the front or to the back of the garment. Cost of embroidery will depend on logo design and stitch count, plus a $55 one time setup fee.
Volume Discount (Auto Applied in Cart)
Volume Discount (Auto Applied in Cart)
Buy 30+ | Save 10% |
Buy 40+ | Save 12% |
Buy 100+ | Save 15% |
Size Chart
Size Chart
Washing Insctruction
Washing Insctruction
- Turn garment inside out to protect graphics
- Use cold or cool wash
- Avoid hot water to minimize shrinking
- Use mild detergent if possible
Order a Sample Box
Order a Sample Box
Want a sample? Check out our Customized Sample Box
Our Essential Jacket is a go-to lightweight jacket. This unlined jacket shields you from breezes and drizzle and it’s easy to stuff into a backpack or bag when the sun comes out.
- 100% polyester
- Water-resistant
- Wind-resistant
- Locker loop
- Front pouch pockets
- Elastic cuffs and hem
DTG / DTF Printing:
DTF Printing can be done to the front, back, or side of the garment, front and back is limited to an area of 10" x 12" and side is limited according to the specific garment type. Cost of DTF printing is included in the price.
Embroidery:
Embroidery can be done to the front or to the back of the garment, limited to a 4" x 4" area. Cost of embroidery is $10 per piece of garment + $40 digitizing per design. Please contact us directly to send us your logo to be digitized.
You have the option to upload your deisng in this product page, or you can email your design to info@customcraftsolution.com after your purchase (please include your order number for reference)
We will email you with a mockup to varify the size & placement of the design. The mockup MUST BE APPROVED by you before we move forward to production.